- Morrisons Balfour Kirkpatrick JV - More Info »
-
Main Contractor: Morrisons Balfour Kirkpatrick JV Duration of contract: Feb 2007 - ongoing Area of Work: Whitelees Windfarm, Eaglesham Moor Brief Summary of Works: AB 2000, as one of the preferred suppliers of plant to the project are supplying heavy earthworks plant which is helping to construct approximately 90km of access track, and move the c 1.8 million m³ of rock which is being quarried from the borrow pits across the site, making us one of the largest 'quarries' in Scotland. The turbine base construction involves pouring approx 56,000m³ of concrete, which involves approx 6,300 tonnes of reinforcement.
Whitelees is the largest windfarm currently in construction in Europe with 140 no. turbines, which differ slightly. 100no. have towers that are 65m high, and 40 no. have towers that are 60m high. Each turbine has three 110m blades despite being different heights. The completed windfarm will generate approx 322 megawats of electricity enough energy to power 200,000 homes.
-
------------------------------------------------------------------------------------------------
- Levenseat Limited - More Info »
-
Main Contractor: Levenseat Limited Duration of Contract: 6 months Contract Value: £1,000,000 Area of Work: Fauldhouse, West Lothian, Scotland Brief Summary of Works: To construct a fully operational landfill cell from virgin land with access and egress roads, secure perimeter fencing and security gates.
-
------------------------------------------------------------------------------------------------
- Scotish Power- More Info »
-
Main Contractor: Scottish Power Duration of Contract: 3 months Contract Value: £450,000 Area of Work: Longannet Power Station, Kincardine, Fife Brief Summary of Works: The movement of ash from the power station to pre-arranged areas involving construction of ash lagoons, haul roads and access and egress roads with particular care to the operational railway line passing through the contract area.
-
------------------------------------------------------------------------------------------------
- Shanks Ltd - More Info »
-
Main Contractor: Shanks Ltd Contract Value: £500.000 Area of Work: Stranraer Brief Summary of Works: Construction of a new waste disposal cell. The contract included the creation of a new landfill cell and associated hard standing areas. This included a 140.000 m3 muck shifting operation.
-
------------------------------------------------------------------------------------------------
- Aggregate Industries - More Info »
-
Main Contractor: Aggregate Industries Area of Work: Dumbuckhill Quarry Brief Summary of Works: 100,000t overburden strip and muckshift including removal of a significant volume of rockhead. The material was then crushed, screened and processed to prepare an area on site for building company works.
-
------------------------------------------------------------------------------------------------
- Aggregate Industries - More Info »
-
Main Contractor: Aggregate Industries Area of Work: Croy Quarry Brief Summary of Works: Regular crushing and screening contract for overburden strip and rockhead at Croy Quarry. Total expected volume 600,000t by conclusion of contract.
-
------------------------------------------------------------------------------------------------
- ICI Plc. - More Info »
-
Main Contractor: ICI Plc. Area of Work: Ardeer, Stevenston. Brief Summary of Works: This was a major earthmoving contract, which included bulk screening and crushing to remove 100 year old detonators from the raw feedstock. These explosives were waste from a past manufacturing process at the site. This process produced a reusable fill material, which was then used partly on site for restoration with the remaining material being recycled to a major highway contract in the West of Scotland. The final result was a viable brownfield site ready for development - which may even include a golf course.
-
------------------------------------------------------------------------------------------------